Laserfiche WebLink
Page 5 of 115 <br />DEMOLITION WORK <br />Task description: Demo Collom Facilities and Haul Road Crossing (MR185) <br />Site: Colowyo Coal Mine Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task 002 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />UNIT COSTS <br />95.50% <br />Abbreviation: None <br />Filename: C019-002 <br />Location adjustment: <br />Structure or <br />Item Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />14 Manhole <br />4'x 2'x. 4' <br />Pipe, sewer/water- <br />56.00 <br />LF <br />$6.83 <br />$382.48 <br />Covers <br />27 to 36 in. <br />diameterpipe <br />15 Collom Power <br />20' <br />Utility Poles, Wood <br />15.00 <br />EA <br />$214.50 <br />$3,217.50 <br />Poles <br />20' to 0' high (each <br />ole <br />ANFO Silo #1 <br />10' dia x 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />ANFO Silo #2 <br />10' diax 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />ANFO Silo #3 <br />10' dia x 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Communications <br />20'x 20' x <br />Bldg. (SN) <br />4,800.00 <br />CF <br />$0.19 <br />$888.00 <br />Building <br />12' <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Demo Blasters <br />50' x 80' x <br />Bldg. (SN) <br />76,000.00 <br />CF <br />$0.19 <br />$14,060.00 <br />Building <br />19' <br />demo./on-site <br />disposal in existing <br />pit or cut - Max <br />10,000 ft. haul <br />Demo Concrete <br />110'x 100'x <br />Pavement, concrete, <br />764.00 <br />CY <br />$91.00 <br />$69,524.00 <br />Pad # 1 <br />1.875' <br />demolition only, 7 <br />in. to 24 in. thick - <br />No reinforcing <br />Demo Concrete <br />10' x 32' x <br />Pavement, concrete, <br />223.00 <br />CY <br />$91.00 <br />$20,293.00 <br />Pad #2 1 <br />1.875' 1 <br />demolition only, 7 <br />CIRCES Cost Estimating Software <br />