Laserfiche WebLink
Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG. <br />Material consistency: <br />1.200 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.903 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.6790 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />1,948.93 LCY/hr <br />1948.93 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: 0.243/LCY <br />Totaljob time <br />Totaljob cost <br />14.02 Hours <br />$6,641 <br />Page 91 of 115 <br />CIRCES Cost Estimating S011ware <br />