Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings, ponds, etc. <br /> All activities are located on patented claims(private land)to which the applicant has secured legal right-of-entry. <br /> perform limited upland trenching and core drilling to confirm extension of known veins. There are existing level pad <br /> drainages or discharges will be disturbed,and stormwater and sediment will be controlled. Reopened portals will either <br /> ha harkfillarl altar sampling nr sarj irPd by inctalling steal cats ar timharing and sterol gatpa with hnndfad Inr4c <br /> Applicant will access all work areas for upland trenching and drilling..via existing roads as much as possible. No more <br /> than n drillhnles wil hp open nt nnP fimA Tranrhaa will ha samplpdnj3d rin-.tpdpromptly_ The mZlndy of„ro;1dd;Ije%Ad arK <br /> existing, and an estimated 1000 LF of new roadways constructed. Any new roads or trails that must be constructed to <br /> aC:rnmmndata drilling achvities will he stahjlizpd and radmimad- ri itclnnas And fills will Mpg6lod and ceerlad but _ <br /> roadbeds will remain. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth,location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 20 Width (ft) 60 Length (ft) 50 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 20 Depth (ft) 600 avg (in) 4 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 20 Width (ft) 10 Length (ft) 10 Depth (ft) 2 <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> The applicant proposes to reopen up to 5 historic,caved portals(see map),to allow access to the workings to take <br /> hydrologic balance. The estimated total amount of caved material to remove from the five adits measures approx 200 <br /> steel gates. Any material not backfilled wil.be respread on the pads,used for stormwater controls or safety berms,or <br /> Up to 30 trenches will be excavated for sampling, then will be closed promptly. There will be no more than 3 trenches <br /> Form 2—Public File Page 6 of 14 <br />