My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-27_PERMIT FILE - C1981035A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2019-08-27_PERMIT FILE - C1981035A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 8:44:57 AM
Creation date
9/10/2019 1:06:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
8/27/2019
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: King Coal Mine <br />COST SUMMARY WORK <br />Reclamation Tasks for Permit Renewal No. 7 <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 10/30/2017 <br />2:55:57 PM <br />User: JHB <br />Permit Action: RN7 <br />State: Colorado <br />County: La Plata <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Permit/Job#: C1981035 <br />Abbreviation: None <br />Filename: C035-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />025 <br />032 <br />050 <br />051 <br />052 <br />060 <br />062 <br />064 <br />065 <br />100 <br />200 <br />Demolish King I Structures DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />50.00 <br />$40,750.20 <br />$610.00 <br />$3,362.00 <br />$972.00 <br />$168.00 <br />$1,803.00 <br />$307.00 <br />$1,205.00 <br />$97.00 <br />$1,095.00 <br />$1,616.00 <br />$231.00 <br />$534.00 <br />$7,780.00 <br />$1,999.00 <br />$655.00 <br />$85.00 <br />$994.00 <br />$161.00 <br />$1,840.00 <br />$1,550.62 <br />$2,073.00 <br />$1,711.00 <br />$4,258.80 <br />$10,051.00 <br />$5,148.00 <br />$2,780.00 <br />$4,258.80 <br />$3,150.00 <br />$5,126.00 <br />$23,690.00 <br />$110,737.60 <br />$207,465.41 <br />King I - Rip 12" in upper facility area RIPPER <br />2.95 <br />King I - push ripped waste to tipple highwall DOZER <br />16.28 <br />King I - haul topsoil/growth medium to Upper TRUCKI <br />Facilities Area <br />4.51 <br />King I - Finish grade upper facilities area GRADER <br />1.92 <br />King I - Revegetate upper facilities area (area #3) REVEGE <br />4.00 <br />King I - backfill portals, grade fill slope and topsoil DOZER <br />1.54 <br />Kin I - revegetate highwall area (Area #4) REVEGE <br />4.00 <br />King I - rip and final grade lower facilities area GRADER <br />1.09 <br />King I - revegetate highwall area (Area #4) REVEGE <br />4.00 <br />King I - regrade cover of pre -law portion of refuse DOZER <br />area <br />8.11 <br />King I - regrade 6" growth medium on pre -law DOZER <br />refuse area <br />1.16 <br />King I - revegetate refuse area (Area #5) REVEGE <br />2.00 <br />King I - Push 3.5' cover to refuse pile DOZER <br />39.02 <br />King I - grade 3.5' cover on post -law refuse area DOZER <br />10.03 <br />King I - Haul topsoil to post -law refuse area TRUCKI <br />3.03 <br />Kin I - finish grade post -law refuse area (area #6) GRADER <br />0.97 <br />King I - revegetate refuse area (Area #6) REVEGE <br />2.00 <br />King I - finish grade topsoil area GRADER <br />1.84 <br />King I - revegetate borrow area REVEGE <br />4.00 <br />King I - seal vent hole BOREHOLE <br />8.00 <br />King I - backfill and regrade east and west DOZER <br />sediment ponds <br />10.40 <br />King I - revegetate east and west ponds (Area #6) REVEGE <br />4.00 <br />King I -Rill and gully maint. 8 hours every other SITEMAINT <br />yr, 10 yrs ENANCE <br />24.00 <br />King I&II - mobilize for initial reclamation MOBILIZE <br />8.00 <br />King I&II - mobilize for rill and gully MOBILIZE <br />maintenance, X 3 <br />8.00 <br />King I&II - mobilize for second pond cleaning MOBILIZE <br />8.00 <br />King II -Rill and gully maint. 8 hours every other SITEMAINT <br />yr, 10 yrs ENANCE <br />24.00 <br />Weed Control over liability period REVEGE <br />35.00 <br />Clean sediment ponds (two cleanings) EXCAVATE <br />65.13 <br />King II - haul sediment from ponds to King I site TRUCKI <br />30.85 <br />Seal Mine Openings MINESEAL <br />32.00 <br />King II structural demolition DEMOLISH <br />140.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.