Laserfiche WebLink
An Annual Hydrology Report compiling and interpreting the hydrologic data will be <br /> prepared based on a water year of October 1 through September 30 each year, and <br /> will be submitted to the Division of Reclamation, Mining & Safety by December 31 of <br /> that year. <br /> SURFACE WATER MONITORING <br /> In the event of any discharge from any NPDES Discharge Point, the following <br /> parameters will be sampled: <br /> a) Ph (SU) <br /> b) Solids, total suspended (mg/L) <br /> c) Solids, settleable (mg/L <br /> d) Iron, total recoverable (mg/L) <br /> e) Oil and grease (mg/L) <br /> fl Flow, in conduit or thru treatment plant (MGD) <br /> g) Solids, total dissolved (mg/L) <br /> h) Oil and grease visual <br /> GCC Energy, LLC King II Mine <br /> Section 2.05.6 <br /> Page 11 May 10, 2019 (MR-48) <br />