Laserfiche WebLink
Map Symbol <br />Structure Description <br />Structure <br />J <br />2n <br />_ <br />Slab <br />_ 0Y _ <br />F- C'J <br />Foundation/Footers <br />w,ECn� <br />) F C3 <br />Comments <br />A <br />Water Storage Tank, 100,000 Gallon <br />14771 <br />24 <br />28 <br />Circular pad <br />= 613 ft2 x.75 <br />Steel Structure <br />B <br />Water Storage Tank, 37,000 Gallon <br />5007 <br />35 <br />13.5 <br />32 <br />14 <br />6 <br />Steel Structure <br />C <br />Main Pum House <br />1774 <br />14 <br />10 <br />12.67 <br />Metal Building <br />D <br />ShopEquipment Wash Pad <br />0 <br />50 <br />25 <br />075 <br />150 <br />2 <br />1 <br />Concrete Pad <br />E <br />ShopBuilding48000 <br />60 <br />50 <br />16 <br />60 <br />50 <br />0.75 <br />220 <br />2 <br />1 <br />Metal Building <br />F <br />Mine Fan <br />7508 <br />28.6 <br />25 <br />10 5 <br />8 <br />6 <br />4 <br />Steel Structure <br />G <br />RetainingWall Adjacent to Main Fan <br />480 <br />60 <br />1 <br />8 <br />60 <br />7 <br />1 <br />Concrete Wall <br />H <br />Total Portal Reclaim Fill Volume <br />20,500 d3 <br />See Ma Km II -010D <br />1 <br />Fan Portal Structure <br />4800 <br />30 <br />20 <br />8 <br />30 <br />20 <br />1 <br />100 <br />0.75 <br />4 <br />Metal Building <br />J <br />Travelwa Portal Structure <br />4800 <br />30 <br />20 <br />8 <br />60 <br />14 <br />1 <br />Metal/Concrete Building, No Floor <br />K <br />Portal Motor Control Center Portal MCC <br />1800 <br />14 <br />10 <br />12.67 <br />14 <br />10 <br />0.5 <br />48 <br />2 <br />0.75 <br />Metal Building <br />L <br />Rock Dust Storage Silo <br />3799 <br />40 <br />11 <br />12 <br />12 <br />1 <br />2 <br />2 <br />2 <br />Steel Structure <br />M1 <br />Concrete RetainingWall #1 <br />900 <br />150 <br />2 <br />3 <br />Concrete Block Wall <br />M2 <br />Concrete RetainingWall #2 <br />560 <br />70 <br />2 <br />4 <br />Concrete Block Wall <br />N <br />Executive Offices/Parts Warehouse/Bath House Building306000 <br />150 <br />60 <br />34 <br />150 <br />60 <br />0.5 <br />420 <br />1 <br />4 <br />Metal Building <br />0 <br />Covered Storage Building (Open, Three Sided) <br />29600 <br />80 <br />20 <br />18.5 <br />80 <br />26 <br />0.5 <br />260 <br />1 <br />4 <br />Metal Building, Includes Internal <br />Footings <br />P <br />Main Septic System Tank <br />600 <br />10 <br />10 <br />6 <br />4000 Gallon Tank <br />Q <br />Main Parking Area <br />0 <br />80 <br />120 <br />Graveled Area <br />R <br />I Fuel Storage Building <br />22500 <br />45 <br />25 <br />20 <br />45 <br />27 <br />0.75 <br />140 <br />1 <br />4 <br />Includes 4' apron on west half <br />S <br />Main Septic System Drain Field <br />0 <br />80 <br />50 <br />Leach Field <br />T <br />Belt Portal Structure <br />3000 <br />15 <br />20 <br />10 <br />30 <br />1 <br />2 <br />Metal/Concrete Building, No Floor <br />U <br />Return Portal Structure <br />3000 <br />15 <br />20 <br />10 <br />30 <br />1 <br />2 <br />Metal/Concrete Building, No Floor <br />V <br />Belt Portal Pump House <br />2800 <br />20 <br />14 <br />10 <br />20 <br />14 <br />0.75 <br />68 <br />2 <br />1 <br />Concrete building (walls & ceiling 1' <br />wlrebar <br />W <br />Waste Rock Storage Area(Waste Rock Trucked to Kin I <br />0 <br />20 <br />20 <br />Temporary Gob Storage <br />X <br />Bermed Topsoil Storage #2 <br />19,000yd3 <br />Topsoil and Subsoil are Equal at this <br />site <br />Y <br />Electrical Substation, Building <br />2660 <br />19 <br />14 <br />10 <br />19 <br />14 <br />0.5 <br />Metal Building, Concrete Pad, <br />Thickened Edge <br />Y1 <br />Electrical Substation, Slabs <br />35 <br />35 <br />0.5 <br />Various Slabs, Thickened Edge <br />Z <br />Electrical Substation Ground Field Buried Copper Wire <br />5000 <br />50 <br />50 <br />2 <br />AA <br />Main Dum ster Pad <br />0 <br />20 <br />8 <br />0.5 <br />Concrete Pad, Thickened Edge <br />BBO <br />_Slope Conveyor Box Truss Section <br />15360 <br />240 <br />8 <br />8 <br />Belt Conveyor, 42" <br />BB1 <br />Sloe Conveyor: Bent 1 <br />7 <br />3 <br />0.75 <br />3 <br />8.5 <br />3.25 <br />1 1 <br />1.5 <br />1.5 <br />4 <br />2 <br />Steel Structure <br />682 <br />Sloe Conveyor: Bent 2 <br />105 <br />5 <br />7 <br />3 <br />10 <br />5 <br />1 1 <br />1.5 <br />1.5 <br />4 <br />2 <br />Steel Structure <br />BB3 <br />Sloe Conveyor. Bent 3 <br />21 <br />5 <br />0.75 <br />55 <br />10 <br />5 <br />1 1 <br />1.5 <br />1.5 <br />4 <br />2 <br />Steel Structure <br />BB4 <br />Slope Conveyor: Bent 4 <br />26 <br />5 <br />0.75 <br />7 <br />15 <br />7 <br />1.2 1 <br />1.5 <br />1.5 <br />4 <br />2 <br />Steel Structure <br />BB5 <br />Sloe Conveyor: Bent 5 <br />5550 <br />18.5 <br />5 <br />60 <br />10 <br />10 <br />1.5 2 <br />2 <br />3 <br />4 <br />2 <br />Steel Structure <br />B86 <br />SIoa Conve or Non -Box Truss Section <br />1760 <br />110 1 <br />4 <br />4 <br />1 <br />Belt Conveyor, 42" <br />CC <br />Magnet Dum ster Pad #1 <br />0 <br />1 1 <br />8 <br />8 <br />0.5 1 <br />1 <br />1 <br />1 Concrete Pad, Thickened Edge <br />GCC Energy, LLC King II Mine Page 7 <br />Section 2.05.4 July 11, 2017 (RN -07) <br />