My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-10_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2019-09-10_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 3:57:43 PM
Creation date
9/10/2019 10:43:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/10/2019
Doc Name
Application
From
Seneca Property, LLC
To
DRMS
Type & Sequence
SL7
Email Name
RAR
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division's current calculated reclamation liability is $1,379,988.51. SPL has posted a <br /> Financial Warranty Corporate Surety issued by Lexon Insurance Company in the amount of <br /> $1,379,988.51 effective March 14th, 2018. <br /> MAP DESCRIPTION <br /> Map !A ST= 7 Bend Release Bleek Af:ea Pelinea6efi Map. This fliap shews all f:e"ested Phas-e <br /> ems. <br /> Map 1B - Phase III and Phase II+ III Bond Release SL-7 Area Delineation Map. This map <br /> shows all requested Phase III areas. The Phase III areas meet the minimum 10 year <br /> period for revegetation <br /> Map 2— Phase II and III Bond Release SL-7 Permanent Features Map. This map shows permanent <br /> features documented in the mine permit. <br /> Map 3 - Post Mining Topography Map. This map can be compared to the pre-mining <br /> topography map for elevation comparisons <br /> Map 4 — SL-7 General Location Map. This map shows the general location of the Yoast Mine <br /> property boundaries relative to other land marks. <br /> BOND RELEASE DOCUMENTATION <br /> This application originally represented a formal request for partial Phase II Bond Release on 143.3 <br /> acres,partial Phase III Bond Release on 41.4 acres, and partial Phase II&III on 314.1 acres(BRB- <br /> 2) of reclaimed lands at the Yoast Mine (see Maps IA & 113). SL7 was revised to remove the <br /> 143.3 acres of Phase II which will be included in SL8. These reclaimed lands comply with <br /> applicable success and demonstration criteria set forth in Rule 4 —Performance Standards and the <br /> approved Yoast permit. <br /> SL-7 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.