Laserfiche WebLink
Page 68 of 73 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION <br /> Total one-way travel distance: 25.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* <br /> `*two round trips with haul rig: $4,314.52 <br /> Total Roadable Mob/Demob Cost** <br /> ** one round trip, :no haul ri $3 6 5.41 <br /> g <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.50 0.50 <br /> Return Time(Hours): 0.50 0.50 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.00 1.00 <br /> JOB TIME AND COST <br /> Total job time: 4.00 Hours <br /> Total job cost: $4,680 <br />