Laserfiche WebLink
Page 56 of 73 <br /> Truck Travel(Haul&Return)Time: Road Condition: Firm, smooth,rolling, dirt/It. surfaced,watered <br /> maintained 3.0 <br /> Haul ou e: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 900.00 0.00 3.00 3.00 2824 0.422 <br /> Haul Time: 0.422 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 900.00 0.00 3.00 3.00 2874 0.342 <br /> Return Time: 0.342 minutes <br /> Total Truck Cycle Time: 3.265 minutes <br /> Loading Tool unit <br /> Production 294.96 LCY/Hour Adjusted for job efficiency: 244.81 LCY/Hour <br /> Truck Unit Production <br /> 153.67 LCY/Hour Adjusted for job efficiency: 127.54 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 382.63 LCY/Hour <br /> Adjusted single truck/loader team production: 244.81 LCY/Hour <br /> Adjusted multiple truck/loader team production: 244.81 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 27.11 Hours <br /> Unit cost: $3.318 /LCY Total job cost: $22,026 <br />