Laserfiche WebLink
Page 29 of 73 <br /> Site: Fruita Loadout Permit Action: MT2 Permit/Job#: C2010088 <br /> PROJECT IDENTIFICATION <br /> Task#: 020 State: Colorado Abbreviation: None <br /> Date: 9/4/2019 County: Mesa Filename: 020 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU Horsepower: 405 <br /> Ripper Attachment: 1-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $121.49 NA <br /> Operating Cost/Hour: $105.84 100 <br /> Ripper Ownership Cost/Hour: $15.98 NA <br /> Ripper Operating Cost/Hour: $9.64 100 <br /> Operator Cost/Hour: $39.98 NA <br /> Total Unit Cost/Hour: $292.92 <br /> Total Fleet Cost/Hour: $292.92 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 12.60 acres Rip Depth(ft): 2.00 Volume: 4056 BCY or CCY <br /> Source of estimated quantity: Operator Estimate;Map 9;Page 2.05-32 <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 4.05 feet/pass <br /> Average Ripping width: 6.08 feet/pass <br /> Average Ripping Length: 200.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.664 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.664 Acres/hr <br /> Site Altitude: 41500 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.55 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.55 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 22.86 Hours <br /> Unit cost: $531.550 Per acre Total job cost: $69698 <br />