Laserfiche WebLink
Page 27 of 73 <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 800.00 0.00 3.00 3.00 2824 0.387 <br /> Haul Time: 0.387 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 800.00 0.00 3.00 3.00 2874 0.307 <br /> Return Time: 0.307 minutes <br /> Total Truck Cycle Time: 3.378 minutes <br /> Loading Tool unit <br /> Production 314.89 LCY/Hour Adjusted for job efficiency: 261.36 LCY/Hour <br /> Truck Unit Production <br /> 175.62 LCY/Hour Adjusted for job efficiency: 145.77 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 437.30 LCY/Hour <br /> Adjusted single truck/loader team production: 261.36 LCY/Hour <br /> Adjusted multiple truck/loader team production: 261.36 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 8.80 Hours <br /> Unit cost: $3.108 /LCY Total job cost: $79149 <br />