My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-09_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2019-09-09_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:46:35 AM
Creation date
9/10/2019 10:09:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
9/9/2019
Doc Name Note
For MT2
From
DRMS
To
J.E. Stover & Associates
Permit Index Doc Type
Findings
Email Name
CCW
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 24 of 73 <br /> Truck Travel(Haul&Return)Time: Road Condition: Firm, smooth,rolliniz, dirt/It. surfaced,watered, <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1000.00 0.00 3.00 3.00 2824 0.458 <br /> Haul Time: 0.458 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1000.00 0.00 3.00 3.00 2874 0.376 <br /> Return Time: 0.376 minutes <br /> Total Truck Cycle Time: 3.197 minutes <br /> Loading Tool unit <br /> Production 303.65 LCY/Hour Adjusted for job efficiency: 252.03 LCY/Hour <br /> Truck Unit Production <br /> 148.45 LCY/Hour Adjusted for job efficiency: 123.21 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 369.64 LCY/Hour <br /> Adjusted single truck/loader team production: 252.03 LCY/Hour <br /> Adjusted multiple truck/loader team production: 252.03 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 69.34 Hours <br /> Unit cost: $3.223 /LCY Total job cost: $569329 <br />
The URL can be used to link to this page
Your browser does not support the video tag.