Laserfiche WebLink
Page 21 of 73 <br /> Truck Travel(Haul&Return)Time: Road Condition: Firm, smooth,rolling, dirt/It. surfaced,watered <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1500.00 0.00 3.00 3.00 2824 0.635 <br /> Haul Time: 0.635 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1500.00 0.00 3.00 3.00 2874 0.550 <br /> Return Time: 0.550 minutes <br /> Total Truck Cycle Time: 3.686 minutes <br /> Loading Tool unit <br /> Production 279.01 LCY/Hour Adjusted for job efficiency: 231.58 LCY/Hour <br /> Truck Unit Production <br /> 128.76 LCY/Hour Adjusted for job efficiency: 106.87 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 320.61 LCY/Hour <br /> Adjusted single truck/loader team production: 231.58 LCY/Hour <br /> Adjusted multiple truck/loader team production: 231.58 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 257.07 Hours <br /> Unit cost: $3.508 /LCY Total job cost: $2089838 <br />