Laserfiche WebLink
Page 16 of 73 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Remove Fill from Haul Road#2 and Place on Facilities Area <br /> Site: Fruita Loadout Permit Action: MT2 Permit/Job#: C2010088 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 9/4/2019 County: Mesa Filename: 002 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 8-10 cy,6x4 <br /> -Loader: Cat 3 3 6D L 10'-6" Stick <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D9T-9SU <br /> Road Maintenance-Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker, 5,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA 100 50 100 <br /> Ownership cost/hour: $16.33 $55.49 NA $121.49 $33.62 $27.40 <br /> Operating cost/hour: $42.75 $64.62 NA $105.84 $17.11 $39.99 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 NA $0.00 $0.00 $0.00 <br /> cost/hour: <br /> Ripper op. cost/hour: NA $0.00 NA $0.00 $0.00 $0.00 <br /> Operator cost/hour: $0.00 $45.39 NA $39.98 $45.39 $38.86 <br /> Unit Subtotals: $59.08 $165.49 NA $267.31 $96.11 $106.24 <br /> Number of Units: 3 1 0 1 1 1 <br /> Group Subtotals: Work: $342.73 Support: $267.31 Maint: $202.35 <br /> Total work team cost/hour: $812.39 <br /> MATERIAL QUANTITIES <br /> Initial volume: 2,700 CCY Swell factor: 1.165 <br /> Loose volume: 39146 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety;Map 15 <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload weight, Basis: <br /> Material weight: 2,900 Pounds/LCY <br /> Description: Decomposed rock-50%Rock, 50%Earth <br />