Laserfiche WebLink
Page 11 of 73 <br /> COST SUMMARY WORK <br /> Task description: Midterm No.2 <br /> Site: Fruita Loadout Permit Action: MT2 Permit/Job#: C2010088 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 9/4/2019 County: Mesa Filename: C088-000 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Remove Fill from Haul Road#1 and Place on TRUCKI 1 20.35 $161533 <br /> Facilities Area <br /> 002 Remove Fill from Haul Road#2 and Place on TRUCKI 1 13.58 $111035 <br /> Facilities Area <br /> 003 Remove Fill from Rail Bed and Place on Facilities TRUCKI 1 257.07 $2081838 <br /> Area <br /> 004 Remove Material from Fill Pile and Place on TRUCKI 1 69.34 $561329 <br /> Facilities Area <br /> 005 Remove Coal Fines from Stockpile and Place in TRUCKI 1 8.80 $7,149 <br /> Fill <br /> 015 Compact BackfMilled and Regraded Surfaces COMPACT 1 74.72 $11,916 <br /> 020 Rip Regraded Surfaces Prior to Topsoil RIPPER 1 22.86 $61698 <br /> Replacement <br /> 021 Rip Haul Road#I,#2 and Access Road RIPPER 1 6.13 $11797 <br /> 030 Regrade Haul Road#1 GRADER 1 1.92 $218 <br /> 031 Regrade Haul Road#2 GRADER 1 0.67 $77 <br /> 032 Regrade Access Road GRADER 1 0.30 $35 <br /> 033 Regrade Light-Use Road#2 DOZER 1 3.17 $913 <br /> 040 Finish Grade Disturbed Areas Prior to Seeding GRADER 1 16.56 $1,875 <br /> 045 Regrade Pond 1 DOZER 1 21.09 $61077 <br /> 046 Regrade Pond 2 DOZER 1 21.09 $61077 <br /> 047 Regrade Pond 3 DOZER 1 21.09 $6,077 <br /> 048 Remove Fill from Reed Wash Bridge Area to TRUCKI 1 14.73 $111964 <br /> Facilities Area <br /> 049 Reconstruct Reed Wash at Rail Bridge NA 1 121.22 $43,916 <br /> 050 Regrade Ditches DOZER 1 5.27 $1,519 <br /> 055 Replace Topsoil from Stockpile 1 to Light-Use TRUCKI 1 22.06 $171919 <br /> Road and Rail <br /> 056 Replace Topsoil from Stockpile 2 to Rail Loop TRUCKI 1 27.11 $221026 <br /> 060 Seed All Mine Areas Where Topsoil Was Replaced REVEGE 1 25.40 $331494 <br /> 061 Hydroseed Reconstructed Reed Wash Bridge Area REVEGE 1 4.00 $91590 <br /> 063 Weed Control- Spray Area 3 Times During REVEGE 1 102.30 $71314 <br /> Liability Period <br /> 065 Demolish and Remove All Structures DEMOLISH 1 400.00 $294,026 <br /> 070 Site Maintenance,Rill and Gully Repair and SAE SITEMAINT 1 168.00 $49,526 <br /> Repair ENANCE <br />