Laserfiche WebLink
RECLAMATION PLAN EXHIBIT E (CONT) <br /> RECLAMATION TIMETABLE <br /> Reclamation will begin once enough area has been opened so <br /> that any reclamation completed will not be disturbed as mining <br /> progresses . This may take 10 or more years depending on the <br /> economic conditions in the area and the amount of material mined. <br /> The operator anticipates approximately 95% of the total mined <br /> land will be reclaimed by the time mining is completed. A <br /> portion of the floor area will be complete, but the area under <br /> the plant site/stockpile area will still need work and grading of <br /> the final face area will be that last area to be reclaimed. <br /> Within one year after the stockpiles have been removed, all <br /> resoiling and revegetation will be complete . The area will then <br /> be monitored for success of revegetation until it is released by <br /> the Board. The operator estimates that, this will happen 3 to 5 <br /> years after mining is completed. <br /> If revegetation problems occur before release, an analysis <br /> of the site will be made and the area will be revegetated again <br /> as necessary. The seed mixture and rates may be revised as <br /> needed to complete reclamation, if a modification is required, <br /> the Division will be notified prior to making the change . This <br /> gives us the most flexibility to complete reclamation <br /> successfully. <br /> RECLAMATION TIMETABLE (REVISED 7/19) <br /> Acres ± <br /> Stage Years Total Revegetation Road Undisturbed <br /> Area <br /> I 3-5 66 . 1 48 . 8 1 . 1 16 . 2 <br /> II 3-5 213 . 7 170 . 0 3 . 0 40 . 6 <br /> III 3-5 54 . 2 38 . 1 1 . 1 15 . 0 <br /> IV 3-5 24 . 3 14 . 3 0 . 6 9 . 4 <br /> V 3-5 20 . 8 13 .4 0 . 9 6 . 5 <br /> VI 3-5 268 .4 219 . 9 2 . 4 46 . 1 <br /> Drainage Drainagel LOM 1 86 . 2 1 0 . 0 1 0 . 0 1 86 . 2 <br /> Totals 733 . 7 1 504 . 5 9 . 1 220 . 0 <br /> 18 (revised 9/9/19) <br />