My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-09_PERMIT FILE - M2018063
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018063
>
2019-09-09_PERMIT FILE - M2018063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:37:08 AM
Creation date
9/9/2019 3:59:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018063
IBM Index Class Name
Permit File
Doc Date
9/9/2019
From
Environment Inc. - Ellicott Sand & Gravel LLC
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN EXHIBIT D (CONT) <br /> Each time the mine is re-entered, mining begins by setting <br /> up the plant and if needed an area is stripped. The salvaged <br /> topsoil will be stockpiled along the mine perimeter setbacks or <br /> on the mine floor, i .e . , in places where it will not be disturbed <br /> until needed. Much of the permit area will continue to be used <br /> by the owners for their ranching purposes throughout the life of <br /> the mine . The approximate location of the soil piles are shown <br /> on the MINING PLAN MAP. <br /> Mining will begin on a section of the slopes created at the <br /> end of the last mining cycle until a near vertical face is open. <br /> This face will be worked to the east and west until it extends <br /> across the property and at that time mining will progress to the <br /> south or north depending on the Stage mining is taking place . As <br /> mining progresses thru the site the processing plant will be set <br /> near the open face to reduce the haul distance from the mine <br /> face . <br /> As mining progresses the plan is to begin to armor both <br /> sides of the embankment along the creek channel . The plan entails <br /> building the channel side armoring as mining progresses when <br /> mining gets within 350 feet of the channel bank. When mining <br /> reaches the final dig line on the excavation side that section <br /> will be armored. In general, the toe of the armoring will be <br /> below the thalweg of the channel, so on the outside it will be 5 <br /> ft below and in the inside it will be 3 feet below. The material <br /> will be placed a minimum of two (2) feet thick. <br /> The armoring material to be used will be recycled <br /> concrete/asphalt that conforms to the definition of Inert <br /> Material, available to the Ellicott Sand & Gravel, the exterior <br /> slopes will be graded 2 . 5 : 1 and the inside slopes will be 3 : 1 . <br /> The size of the material will fall in the range of 12 to 36 <br /> inches or greater and will be placed below grade and on the <br /> inside it will be covered with material from on site . Adequate <br /> quantities will be stored on site to complete the necessary <br /> armoring on any give section. It will then be seeded when the <br /> area is reclaimed. The Typical Armoring Cross Section show on <br /> Figure D-2 provides details . <br /> This pit will be operated year-around by Ellicott Sand & <br /> Gravel LLC, weather permitting. There may be periods when the <br /> demands for material are slow and no mining will take place at <br /> which time the mine will become an Intermediate Operation. <br /> 7 (revised 9/9/19) <br />
The URL can be used to link to this page
Your browser does not support the video tag.