Laserfiche WebLink
29 August,2019 C-1982-057/Seneca II-W Mine RAR <br /> spring runoff and precipitation events. <br /> o No evidence of offsite impacts were observed. <br /> HYDROLOGIC BALANCE—Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge <br /> Structures 4.05.71 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br /> Monitoring 4.05.13; Drainage-Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, <br /> 4.05.9; Stream Buffer Zones 4.05.18 <br /> o Pond#6 was experiencing inflow and discharging a clear water. Slopes were well <br /> vegetated and stable. No seepage was detected through the outslope of the dam at the <br /> time of inspection. The slump above was noted. <br /> o Pond 15 was discharging clear water and the drop structure appeared to be functioning <br /> adequately at the time of inspection. The north bank was sparsely vegetated in places. <br /> o Pond 16 was discharging clear water and the drop structure appeared to be functioning <br /> adequately at the time of inspection. <br /> o Pond 17 was discharging clear water and the drop structure appeared to be functioning <br /> adequately at the time of inspection. Stabilization repairs had been made at the flume. <br /> o Constructed drainages appeared stable and to be functioning adequately at the time of <br /> inspection. They appeared well armored. <br /> o Erosional features were noted as shown belos. <br /> t <br /> 74 <br /> c 1 � <br /> � tit L <br /> Map 2: The yellow dot shows the location of <br /> Map 1: The yellow dot shows the location erosional features as shown in the photo 8 <br /> of cracking as shown in the photo 4 below. below. <br /> TOPSOIL-Rule 4.06 <br /> Removal4.06.2;Substitute Materials 4.06.4(4);Storage and Protection 4.06.3;Redistribution 4.06.4: <br /> o Topsoil piles, mostly associated with permanent roads and ponds, were observed to be <br /> adequately marked, stable and vegetated. <br /> o As the site has been reclaimed,most topsoil has been utilized throughout the site. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 11 <br />