Laserfiche WebLink
COLORADO <br /> Division of Reclamation, 405 <br /> Mining and Safety <br /> Department of Natural Resources <br /> MINERALS PROGRAM INSPECTION REPORT <br /> PHONE: (303) 866-3567 <br /> The Division of Reclamation,Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> Franson Pit M-2014-051 Sand and gravel Yuma <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP.TIME: <br /> Monitoring Eric C. Scott September 4,2019 10:40 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Franson Family Partnership,a Limited Partnel Aaron Franson 110c-Construction Limited Impact <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Normal I&E Program Partial Bond $26,600.00 <br /> DATE OF COMPLAINT: POST INSP.CONTACTS: JOINT INSP.AGENCY: <br /> NA None None <br /> WEATHER: INSPECTOR'S SIGNATURE: SIGNATURE DATE: <br /> Clear September 5,2019 <br /> The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Signs & Markers <br /> PROBLEM/POSSIBLE VIOLATION: Problem: The affected area boundary markers are down/incorrectly placed. <br /> This is a problem for failure to maintain boundary markers around the affected area as required by Section <br /> 3.1.12(2) of the rule. <br /> CORRECTIVE ACTIONS: The operator shall conduct a survey and replace the boundary markers in the correct <br /> location(s). The operator shall provide proof to the Division that this has been done by the corrective action <br /> date. <br /> CORRECTIVE ACTION DUE DATE: 10/31/19 <br /> Page 1 of 4 <br />