Laserfiche WebLink
August 29, 2019 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -B ackfill& Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> N -Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N - Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety(Division). <br /> The weather was overcast, dry and warm. There was no activity at the site, and no sign of any recent disturbance. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Oxbow were continuing to explore alternative land uses for the site,but no changes had been made on the <br /> ground. <br /> A considerable amount of material had been deposited on the site by the railroad company, immediately adjacent <br /> to the rail line (within the right of way). <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: I <br /> Number of Complete Inspections this Fiscal Year: I <br /> Page 2 of 4 <br />