My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-29_INSPECTION - C1983059
>
Day Forward
>
Inspection
>
Coal
>
C1983059
>
2019-08-29_INSPECTION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 12:51:57 PM
Creation date
9/3/2019 7:20:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Inspection
Doc Date
8/29/2019
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
8/29/2019
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 29, 2019 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -B ackfill& Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> N -Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N - Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety(Division). <br /> The weather was overcast, dry and warm. There was no activity at the site, and no sign of any recent disturbance. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Oxbow were continuing to explore alternative land uses for the site,but no changes had been made on the <br /> ground. <br /> A considerable amount of material had been deposited on the site by the railroad company, immediately adjacent <br /> to the rail line (within the right of way). <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: I <br /> Number of Complete Inspections this Fiscal Year: I <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.