My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-29_PERMIT FILE - M2019028 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019028
>
2019-08-29_PERMIT FILE - M2019028 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 4:08:54 AM
Creation date
8/30/2019 11:33:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2019
Doc Name
Adequacy Review Response
From
J&T Consulting
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 - Static Condition Slope Stability Analysis Results <br /> Description Calculated Required <br /> Factor Minimum Factor <br /> Of Safety Of Safety <br /> Case 1 -Wetland West of Reservoir 1 1.59 1.50 <br /> Case 1 - Wetland West of Reservoir 1 Full 3.10 1.50 <br /> Reservoir <br /> Case 2 - Cache La Poudre River 1.92 1.50 <br /> Case 2 - Cache La Poudre River Full Reservoir 3.55 1.50 <br /> Case 3 - Cache La Poudre River 2.89 1.50 <br /> Case 3 - Cache La Poudre River Full Reservoir 4.62 1.50 <br /> Case 4 - Gas Line Easement 1.52 1.50 <br /> Case 4 - Gas Line Easement Full Reservoir 2.61 1.50 <br /> Case 5 - Gas Line Easement 1.60 1.50 <br /> Case 5 - Gas Line Easement Full Reservoir 2.96 1.50 <br /> Case 6 -Weld County Parkway Right-of-Way 1.56 1.50 <br /> Case 6 - Weld County Parkway Right-of-Way 2.91 1.50 <br /> Full Reservoir <br /> Case 7 - Irrigation Ditch & Gas Line Easement 1.57 1.50 <br /> Case 7 - Irrigation Ditch & Gas Line Easement 2.93 1.50 <br /> Full Reservoir <br /> Case 8 - Irrigation Ditch & Gas Line Easement 1.52 1.50 <br /> Case 8 - Irrigation Ditch & Gas Line Easement 2.58 1.50 <br /> Full Reservoir <br /> Case 9 - Power Line 1.63 1.50 <br /> Case 9 - Power Line Full Reservoir 2.42 1.50 <br /> Case 10 - Irrigation Ditch 1.54 1.50 <br /> Case 10 - Irrigation Ditch Full Reservoir 3.01 1.50 <br /> Case 11 - Gas Line Easement 1.64 1.50 <br /> Case 11 - Gas Line Easement Full Reservoir 2.99 1.50 <br /> J-2 Contracting Company-DPG Pit <br /> J&T Consulting, Inc. Slope Stability Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.