My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-29_REVISION - M2019032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2019032
>
2019-08-29_REVISION - M2019032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:10:08 AM
Creation date
8/29/2019 1:15:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019032
IBM Index Class Name
REVISION
Doc Date
8/29/2019
Doc Name
Request for Technical Revision
From
Castle Rock Construction
To
DRMS
Type & Sequence
TR1
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF COO <br /> 9 <br /> COLORADO DIVISI( T R 0 1 .TION, MINING AND SAFETY <br /> �87s 1313 Sherman Street,R JPL/mac v <br /> o 80203 ph(303)866-3567RECEI RECEIVED <br /> REQUEST FOR TECHN6N,"F6'V (O N (TR) COVER SHEET AU0 2 9 2019 <br /> File No.: M- 2019-032 Site Name: Brent Pit 0MMINON OF INGANDS filoN <br /> County Lincoln TR# (DRMS Use onl o <br /> Permittee: Castle Rock Construction Company of Colorado, LLC � o N <br /> 03 O <br /> Operator(If Other than Permittee): cD ;D <br /> v Q o <br /> Ralph Bell w <br /> Permittee Representative: o N <br /> Cn <br /> Please provide a brief description of the proposed revision: <br /> To use the North Side of the Brent Pit as an area to crush concrete. All of the material that is <br /> being crushed will he remover) from the site, nothing will be left or buried <br /> 0 <br /> L < <br /> a o —� <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application !7 ;U <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or v <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted " '— <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 11Oc, 111, 112 construction <br /> materials, and 112 quarries $216 F <br /> 112 hard rock (not DMO) $175 ❑ <br /> 11 Od, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.