Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br /> 2352 NORTH 7T"STREET,UNIT B <br /> GRAND JUNCTION,COLORADO 81501 <br /> PHONE:(970)245-4101,FAX:(970)242-7908 <br /> MINE ENGINEERING CIVIL ENGINEERING <br /> MINE RECLAMATION CONST. MANAGEMENT <br /> August 22, 2019 <br /> Rob Zuber <br /> Division of Reclamation, Mining &Safety <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> Re: Bowie Resources, LLC, Bowie No. 2 Mine ED <br /> TR-119, Culvert Installation at Curve#11 Z� 209 <br /> Adequacy Review#1 <br /> Permit C-1996-083 �Jegp110N <br /> Dear Mr. Zuber: <br /> DRMS' letter dated July 23, 2019 transmitted its adequacy review for the referenced technical <br /> revision. On behalf of Bowie Resources, LLC, (BRL), follow are its responses to the DRMS' <br /> comments and concerns. <br /> 1. DRMS: The TR-119 cover page lists revised pages, but this does not appear to match <br /> the pages in the submittal. For example, the list includes page Exh 8-58vii but the <br /> Division does not have this page. Can you send this page or explain its absence? Also, <br /> the submittal includes revised pages Exh 8-29, 29i and 31 that are not listed on the <br /> cover page. Please explain. <br /> BRL: Page Exh. 8-58vii is not part of the submittal. Pages Exh. 8-29, 29i and 31 were <br /> erroneously left off of the cover sheet. <br /> 2. DRMS: Did the top of page Exh. 8-4 get removed? It appears that is did when <br /> compared to the existing page in the PAP. Please address with an explanation or a <br /> revision. <br /> BRL: Please see revised page Exh. 8-4. <br /> 3. DRMS: The table for ditch specifications (page Exh 8-29i) references page 8-17 through <br /> 8-19 for information on the design of this ditch. Please check this page reference; it <br /> appears to be inaccurate. <br /> BRL: The correct reference should be Exh. 8-14 to Exh. 8-16. Please see revised page <br />