My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-27_HYDROLOGY - M1977436
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977436
>
2019-08-27_HYDROLOGY - M1977436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:35:23 PM
Creation date
8/28/2019 3:03:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
Hydrology
Doc Date
8/27/2019
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amended Aggregate Industries South Platte Combined SWSP August 27, 2019 <br /> Plan I Ds 3614, 47731 3624, 47721 4616, 3437, 3376, 3650, 3668, and 5475 Page 8 of 21 <br /> The 3 GIC shares leased by the Applicant are therefore expected to yield a consumptive use amount <br /> of 30.93 acre-feet per year (10.31 acre-feet/share x 3 shares = 30.93 acre-feet). <br /> The ditch-wide analysis decreed in case no. 1996CW658 determined the acreage irrigated <br /> with GIC water rights was 3,501 acres, or 6.74 acres per share. Of that, 2,098 acres were <br /> determined to have been dried up as a result of development ("dry-up pool"). The total required <br /> dry-up associated with the subject 3 shares is 20.22 acres. Of the 3 GIC shares, 1.5 shares were used <br /> to irrigate 2.15 acres identified as Farm E-73a, and the remaining 1.5 shares were used to irrigate <br /> 7.06 acres identified as Farm E-73b. The acreage historically irrigated by the subject shares is below <br /> the irrigated-acreage-per-share historical average of 6.74. As such, the Applicant may claim the <br /> remaining 11.01 acres of required dry-up from the "dry-up pool". The subject farms are no longer <br /> irrigated. <br /> In paragraph 6.7.4. of the decree entered in case no. 1996CW658, future farm headgate <br /> deliveries of the 67.75 shares owned by Poudre Prairie Irrigation Company were limited to 1,712 <br /> acre-feet per year (25.26 acre-feet per share) and 12,631 acre-feet (186.43 acre-feet per share) in <br /> any consecutive 10 year period. For the purposes of this one-year SWSP, deliveries of GIC direct flow <br /> water associated with the 3 shares must be limited to a farm headgate delivery of 55.8 acre-feet <br /> (18.6 acre-feet per share). The historical return flows associated with the 3 shares that are the <br /> subject of this SWSP shall be maintained in accordance with the return flow factors identified in case <br /> no. 1996CW658. The return flow obligations will be accounted for and replaced under this SWSP. <br /> For the purposes of this SWSP, you have used a projected yield of 20.31 acre-feet of GIC <br /> direct flow water per share and 1.19 acre-feet of Fossil Creek Reservoir deliveries per share. These <br /> amounts are consistent with projected deliveries per share for Year One as described in paragraph 28 <br /> of the decree entered in case no. 2003CW348. Projected deliveries for Year One were calculated in <br /> accordance with paragraph 20.3.3 of the decree entered in case no. 2003CW99, and are based on <br /> 2002-2006 recorded deliveries. As specified in case no. 1996CW658, all GIC direct flow deliveries <br /> incur an immediate surface return flow obligation of 23.7%, and all Fossil Creek deliveries incur an <br /> immediate surface return flow obligation of 20.1%. The estimated consumptive use credit is <br /> therefore 15.50 acre-feet per share for GIC direct flow water, and 0.95 acre-feet per share for Fossil <br /> Creek Reservoir water. For the purposes of this SWSP, Aggregate is assuming that the GIC's 60 <br /> preferred rights in Fossil Creek Reservoir will not be available to GIC during WY2019. Excluding the <br /> Fossil Creek Reservoir component of the GIC deliveries, the projected yield of the three shares will <br /> equal 60.93 acre-feet per year (3 shares x 20.31 acre-feet/share), with a return flow obligation of <br /> 21.37 acre-feet. Actual deliveries, which were overall lower than projected deliveries, were used <br /> for the months of April and May 2019, resulting in a revised projected consumptive use credit of <br /> 59.41, with a revised return flow obligation of 20.99 acre-feet. The total consumptive use credit for <br /> the 3 shares is therefore projected to equal 38.42 acre-feet for 2019. <br /> The GIC shares will be delivered back to the river through the 23rd Avenue and Fourth Street <br /> Return Station <br /> St. Wain River <br /> Projected <br /> Replacement Sources 2019 Yield Comments <br /> acre-feet <br /> Martin Marietta lease 14.0 Annual lease <br /> Martin Marietta Lease <br /> Aggregate has entered into a water lease agreement with Martin Marietta Materials, Inc. for <br />
The URL can be used to link to this page
Your browser does not support the video tag.