Laserfiche WebLink
Amended Aggregate Industries South Platte Combined SWSP August 27, 2019 <br /> Plan I Ds 3614, 47731 3624, 47721 4616, 3437, 3376, 3650, 3668, and 5475 Page 3 of 21 <br /> Active Dewatering: No <br /> Hazeltine Pit Status: Mining operations at the Hazeltine Pit have been completed and <br /> (South Platte reclamation is in progress. The Hazeltine Pit was lined with a soil <br /> Mainstem) bentonite slurry wall, and was approved as having been lined to the <br /> design standard referenced in the August 1999 State Engineer Guidelines <br /> for Lining Criteria for Gravel Pits in a letter dated May 25, 2016. The <br /> construction of the slurry wall resulted in groundwater mounding and <br /> flooding of adjacent property. The operator has installed a gravity drain <br /> to dewater the site on a continuous basis. A 45-day leak test was <br /> performed after installation of the permanent drain to verify that the <br /> liner was not impacted. The liner was re-approved in a letter dated <br /> March 22, 2018. Depletions covered by this SWSP are limited to lagged <br /> depletions from past operations at the site, including past dewatering. <br /> Exposed Groundwater Surface: 0 <br /> Active Dewatering: No <br /> Brighton Pit Status: Mining operations at the Brighton Pit are complete and <br /> (South Platte reclamation is in progress. Depletions covered by this SWSP include <br /> Mainstem) water lost due to evaporation and post-pumping dewatering depletions. <br /> The south and central reservoirs are lined with a slurry wall (WDIDs <br /> 0203031 and 0203385) and have obtained SEO liner approval. <br /> Reclamation work includes backfi lli ng the remaining exposed areas, of <br /> which 1 acre was backfi lied in 2013. <br /> Exposed Groundwater Surface: 5.0 acres <br /> Active Dewatering: No <br /> Tucson South Pit Status: Mining Aggregate intends to begin actively mining the Tucson <br /> (South Platte South Pit during 2019. Depletions covered by this SWSP include water <br /> Mainstem) lost due to evaporation, aggregate production, dust control, and <br /> dewatering. Under this amendment, up to an additional 8.0 acres of <br /> groundwater will be exposed at the site as a result of mining and test pits <br /> within the permit boundary. The site is not proposed to be dewatered <br /> during 2019. <br /> Exposed Groundwater Surface: 10.0 acres (including 2.0 acres <br /> transferred from the Tucson Pit) <br /> Active Dewatering: No <br /> Wattenberg Pit Status: Aggregate intends to continue actively mining the Wattenberg Pit <br /> (South Platte during 2019. Depletions covered by this SWSP include water lost due to <br /> Mainstem) evaporation, aggregate production, dust control, and dewatering. Prior <br /> to 2018, the north pit was dewatered with water delivered to the nearby <br /> Broda Pond. The north cell has since been lined, and dewatering <br /> operations have shifted to the south cell with water to be discharged to <br /> multiple locations. A portion of the water will be pumped to the <br /> Stillwater Ski Lake located south of the pit to mitigate lower levels in the <br /> pond due to the suppressed water table resulting from dewatering. A <br /> portion of the water may be pumped to a new recharge pond on the west <br /> side of the site in order to mitigate low water table levels in domestic <br /> wells in the area. The remainder of the dewatering discharge will be <br /> pumped across the South Platte River to the Broda Pond located within <br />