Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company Mâ– NewFields <br /> Squaw Gulch Valley Leach Facility Perspective.Vision. Solutions. <br /> Phase 2A Part 1 Record of Construction <br /> 40-mil LLDPE Geomembrane Site Inventory Control <br /> Resin Lot Width Length Conformance Agru QC Resin Site <br /> Roll Number Area (sf) Delivery <br /> Number (ft) (ft) Test Certification Certification <br /> Date <br /> F14D402025 CEH810040 23 835 19,205 X X X 10/26/14 <br /> F14D402026 CEH810040 23 1 835 19,205 X X 10/26/14 <br /> F14D402027 CEH810040 23 835 19,205 X X 10/26/14 <br /> F14D402028 CEH810040 23 835 19,205 X X 10/26/14 <br /> F14D402030 CEH810040 23 835 19,205 X X 10/26/14 <br /> F14D402031 CEH810040 23 835 19,205 X X 10/26/14 <br /> F14D402032 CEH810040 1 23 1 835 19,205 X X 10/26/14 <br /> Total Rolls 7 Total Area(sf) 134,435 <br /> Page 1 of 1 <br />