NEWMONT <br /> GOLDCORP <br /> In line with previous submittals, the QA/QC personnel did not kept a log of the <br /> location where each roll of geogrid was deployed within the project limits. <br /> 9. Section 3.5.2— Conformance testing: Please provide the following additional <br /> information: <br /> a. Appendix L.1: Please clarify which rolls of 40 mil liner were used during <br /> Phase 2A, Part 1 and where they were deployed?If any rolls of 40 mil liner <br /> were used that were delivered to the site prior to 2019 there is no current <br /> documentation that they meet the current project specification. <br /> The 40mil smooth geomembrane roll with number F17CO03376 was not <br /> used within Phase 2A Part 1 and has been removed from the Inventory <br /> Log. Attachment 14 includes the revised 40mil LLDPE Geomembrane <br /> Inventory Log. In line with previous submittals, the QA/QC personnel <br /> did not keep a log of the location where each roll of 40mil smooth <br /> geomembrane was deployed within the project limits. <br /> b. Appendix L.2: The response is adequate. <br /> The Leak Detection trenches constructed between 2014- 2016 utilized <br /> the stockpiled 40 mil smooth geomembrane that was manufactured in <br /> 2014 and stored onsite in accordance the Technical Specifications <br /> issued by AMEC. NewFields has included the following project <br /> deviation within the report: "The Engineer of Record accepted the use <br /> of the 40 mil LLDPE smooth geomembrane in the Leak Detection Trench <br /> constructed prior to 2019, as it met the Geomembrane Technical <br /> Specifications (Section 02776) previously approved in 2011, and was <br /> manufactured in 2014." <br /> c. Appendix L.3: For the rolls of geogrid indicated in Attachment 4, which ones <br /> were used on Phase 2A, Part 1 and where were they deployed? <br /> In line with previous submittals, the QA/QC personnel did not keep a log <br /> of the location where each roll of geogrid was deployed within the <br /> project limits. <br /> 10. Section 3.5.3— Geomembrane Panel Deployment. The response is adequate. <br /> ADEQUACY REVIEW NO. 2 <br /> Report. <br /> 1. Section 2.11 — Drain Cover Fill: The response is adequate. <br /> Tables & Appendices: <br /> 2. Table 4— Fill Temperature Monitoring Summary: The response is adequate. <br />