Laserfiche WebLink
NEWMONT <br /> G O L D CO R P. Newmont Goldcorp <br /> Cripple Creek&Victor Mine <br /> 100 N 3`d Street <br /> PO Box 191 <br /> Victor,CO 80860 <br /> newmontgoldcorp.com <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED RECEIVED <br /> 7018 0360 0001 1957 5304 <br /> August 27, 2019 AUG 2 8 2019 <br /> DNISION OF RECLAMATION <br /> Mr. Timothy Cazier, P.E. MINING AND SAFETY <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson <br /> Project; Technical Revision 117 — Squaw Gulch Valley Leach Facility Phase 2A <br /> Part 1 Record of Construction Report, , Second Adequacy Review for Nos. 1, 2 <br /> and 3 Response <br /> Dear Mr. Cazier: <br /> On August 23, 2019 Newmont Goldcorp Corporation - Cripple Creek and Victor Gold Mining <br /> Company (CC&V) received the Division of Reclamation, Mining and Safety's (DRMS) Second <br /> Adequacy Review of Nos. 1, 2 and 3 of Technical Revision (TR) No.117. Below, DRMS's <br /> comments are noted in italics followed by CC&V's responses in bold. <br /> ADEQUACY REVIEW NO. 1 <br /> Drawings: <br /> 1. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 Soil Liner Fill Asbuilt, Drawing 3 of 3: The <br /> response is adequate. <br /> 2. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 High Volume Collection Pipe Asbuilts, <br /> Drawings 2 and 3 of 3: The response is adequate. <br /> 3. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 High Volume Collection Pipe Asbuilts, <br /> Drawing 3 of 3: The response is adequate. <br /> 4. Squaw Gulch — 19VLF Phase 2A, Part 1 Drain Cover Fill As-Built Isopach. The response <br /> is adequate. <br /> Report & Appendices: <br />