My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-27_REVISION - M2005059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005059
>
2019-08-27_REVISION - M2005059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:15:21 AM
Creation date
8/27/2019 1:31:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005059
IBM Index Class Name
REVISION
Doc Date
8/27/2019
Doc Name
Request for Technical Revision
From
Asphalt Specialties
To
DRMS
Type & Sequence
TR3
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF,C0 <br /> - COLORADO D VIATION, MINING AND SAFETY <br /> * */876 1313 Sherma TR03 orado 80203 ph(303)866-3567 <br /> 'f " <br /> ECS\mac <br /> REQUEST FOR I ECHNIC:AL KhvisiON (TR) COVER SHEET <br /> File No.: M- 2005-059 site Name: Nelson Mining Resource <br /> ;3; <br /> Weld °a N <br /> 5 ko <br /> County TR# (DBMS Use only) o <br /> Permittee: <br /> Asphalt Specialties Co., Inc. <br /> 'ECEIVED <br /> Operator(If Other than Permittee): <br /> AUG <br /> Permittee Representative. <br /> Greg Geras 2 r 2019 <br /> �fiW1t+1G AND�TIOI <br /> Please provide a brief description of the proposed revision: <br /> Weed control plan for Nelson Mining Resource. ^f/ h?410(E l� <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application o <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I I Oc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> I IOd, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.