Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> August 21,2019 <br /> compact the subgrade. The contractor also utilized a smooth drum compactor attachment <br /> mounted on an excavator on slopes where the two compactors and dozer configuration could <br /> not be used. Compaction of the subgrade was performed in accordance with the applicable <br /> developed method specifications, presented in Appendix E, for the following equipment: <br /> Vibratory smooth drum compactor; <br /> Excavator smooth drum roller attachment; and <br /> r Vibratory sheepsfoot drum compactor. <br /> The CQA Monitor inspected and approved the finished subgrade surface prior to SLF placement. <br /> The as-built subgrade surface is presented in Record Drawings (Pre-2019) No. 1 and 2. Some <br /> minor modifications were made to the subgrade surface during 2019 construction and are <br /> reflected in Record Drawings (Post 2019) No. 1 through 3. <br /> 2.6. Leak Detection Trench <br /> Approximately 2,995 linear feet of leak detection trench was constructed within the Squaw Gulch <br /> VLF Phase 2A limits in accordance with the project Technical Specifications. The Phase 2A leak <br /> detection trench has only been partially constructed, as shown on Record Drawing (Pre-2019) <br /> No.4 and Record Drawing(Post 2019) No. 5.The leak detection trenches installed prior to March <br /> 2019 have been inspected and repaired, as needed, prior to the acceptance of the subgrade. The <br /> remainder of the leak detection trench to be constructed, as well as the leak detection sumps, <br /> will be completed during future construction. <br /> Detail N on IFC Drawing A68 shows the typical leak detection trench section. Per Detail N, a <br /> minimum one foot by one-foot trench was excavated and lined with 40 mil smooth LLDPE <br /> geomembrane. The geomembrane was installed in long strips with a 5-foot overlap and was <br /> overlain by a 12 oz/yd2 non-woven geotextile. A 4-inch diameter perforated corrugated <br /> polyethylene pipe (CPeP) was then placed in the trench. The trench was backfilled with Leak <br /> Detection Fill (LDF) and the geotextile was wrapped around the fill with a minimum 1-foot <br /> overlap. A minimum slope of 0.5 percent was maintained along the entire length of the trench. <br /> Where necessary, portions of the leak detection trench (constructed prior to March 2019), <br /> geotextile was replaced within it.The CQA Monitor observed all leak detection trench installation <br /> to date. <br /> The Squaw Gulch VLF Phase 2A leak detection trench was constructed by installing approximately <br /> 14,975 square feet of 40 mil smooth LLDPE geomembrane, 14,975 square feet of 12 oz/yd2 non- <br /> woven geotextile, 2,995 linear feet of 4-inch CPeP and 111 cy of LDF. <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\1-REPORTS\Cert Report-Phase 2A Part 1\DRMS Comments\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT_Revl.docx <br /> Page 6 <br />