My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-23_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-23_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:24:35 PM
Creation date
8/26/2019 1:01:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/23/2019
Doc Name
Adequacy Review Response #3
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 . <br /> Record of Construction Report <br /> 475.0106.032 <br /> August 21,2019 <br /> area is a continuation of construction. Construction associated with this certification report was <br /> completed in July 2019. <br /> The majority of the earthworks construction to the extent of the finished subgrade elevation <br /> below the SLF was performed concurrently with their Squaw Gulch VLF Phase 1 work prior to <br /> 2019.After January 2019,the Squaw Gulch VLF Phase 2A Part 1 area was constructed placing SLF, <br /> overlain with an 80 mil Linear Low Density Polyethylene(LLDPE)double sided micro-spike(DSMS) <br /> geomembrane, and covered with Drain Cover Fill (DCF). Construction within this area was <br /> completed on July 15, 2019. The Squaw Gulch VLF Phase 2A grading plan and typical VLF cross <br /> sections are shown on Drawings A40 and A60/A62 in the Issued for Construction (IFC) drawing <br /> set, respectively. <br /> 1.2. Parties Involved <br /> Work performed during the Squaw Gulch VLF Phase 2A Part 1 project was completed by several <br /> parties. Responsible parties involved in the project are listed below: <br /> Project management was provided by CC&V. <br /> • During the 2019 construction activities, Messrs. Steve Blaskovich, Jeff Gaul, and John <br /> Shiflett represented CC&V as the Construction Manager and Construction <br /> Superintendents, respectively. <br /> • During the 2016 construction activities, Messrs. John Cora, Ron Roberts, Ron DiDonato <br /> and Jeff Gaul represented CC&V as the Construction Manager and Construction <br /> Superintendents, respectively. <br /> Ames Construction Inc. (Ames)was contracted by CC&V as the general contractor responsible for <br /> all construction activities between January 2013 and January 2019. <br /> Tezak Heavy Equipment Co., Inc. (Tezak) was contracted by CC&V as the general contractor <br /> responsible for all construction activities after January 2019 for the Phase 2A project. <br /> Edward-James Surveying, Inc. (EJS) performed surveying for all construction activities performed <br /> by Tezak. <br /> Tetra Tech,formerly known as American Environmental Group, Ltd. (AEG), was subcontracted by <br /> Tezak to perform the Phase 2A geomembrane installation. <br /> NewFields provided field engineering and construction QA/QC testing and inspection starting on <br /> March 1, 2016. A Staff Schedule of NewFields Personnel is presented in Appendix A. <br /> AMEC provided field engineering and construction QA/QC testing and inspection from the start <br /> of Phase 1 construction until February 29, 2016. Staff Schedules of AMEC Personnel are <br /> presented in previous ROC reports. <br /> Foresight West Surveying, Inc. (Foresight) performed third party surveying. <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\J-REPORTS\Cert Report-Phase 2A Part 1\DRMS Comments\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT_Revl.docx <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.