My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-22_REVISION - M1983158
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983158
>
2019-08-22_REVISION - M1983158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:05:21 PM
Creation date
8/22/2019 12:15:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983158
IBM Index Class Name
REVISION
Doc Date
8/22/2019
Doc Name
Request for Technical Revision
From
MJ Cadgene
To
DRMS
Type & Sequence
TR1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br /> 2352 NORTH 7T"STREET,UNIT B <br /> GRAND JUNCTION,COLORADO 81501 <br /> PHONE:(970)245-4101,FAX:(970)242-7908 <br /> MINE ENGINEERING CIVIL ENGINEERING <br /> MINE RECLAMATION CONST. MANAGEMENT <br /> August 19, 2019 <br /> Dustin Czapla <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re: M J Cadgene, Cadgene Pit <br /> Application for a Technical Revision <br /> M-1983-158 <br /> Dear Mr. Czapla: <br /> DRMS performed an inspection of the Cadgene Pit on May 1, 2019. The DRMS' inspection <br /> report noted reclamation work had occurred since the last inspection. The landowner asked <br /> the DRMS inspector about retaining the existing materials stockpiles for use on the ranch <br /> property, and foregoing revegetation on the pit floor in order to leave a flat graveled surface <br /> for equipment storage related to ranch operations. The inspector indicated these changes <br /> would need to be addressed through a technical revision to the permit. <br /> On behalf of M J Cadgene, attached is an application for a technical revision to amend the <br /> reclamation plan for the Cadgene Pit. A revised reclamation plan narrative, reclamation plan <br /> map and the required fee are enclosed. Additional highwall reduction has occurred since the <br /> May 1, 2019 inspection. <br /> Sincerely, <br /> J. E. Stov-er <br /> J. E. Stover P.E. <br /> Consulting Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.