Laserfiche WebLink
to the other sections of the pond. The pond was discharging at the time of the inspection. Embankments were <br /> stable and well vegetated. <br /> P, <br /> H <br /> _ vd <br /> m, <br /> N <br /> ):d.:NW"IN"A:ti ai <br /> ' �Rw <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Progression of the Collom Pit continues. <br /> REVEGETATION—Rule 4.15 <br /> Vegetative Cover; Timing: <br /> Heavy concentration of thistle was observed on the lower elevation of ST001 reclamation parcel.Visible signs of <br /> weed spraying was observed with the thistle patches. <br /> SLIDES and DAMAGE -Rule 4.12: <br /> Rill repair work was observed within three of the reclamation parcels (STOO 1, ST002 and EP058). <br /> The majority of the repair work was done on the northern end of ST001. Repair work was done utilizing a dozer to <br /> fill in the erosional features. A total of 5 individual rills were repaired and two areas which consisted of what <br /> appeared to be multiple rills were repaired. The areas were roughly measured walking the perimeter of the <br /> disturbance and using GPS to collect the area. Each individual rill repair line was also walked with GPS to get the <br /> length and the width of each line measured with a tape measure. Each rill repair line width was approximately 20 <br /> feet. <br /> The two other rill repairs in ST002 and EP058 were individual lines with similar widths. They were not collected <br /> via GPS due to the limited disturbance compared to the overall area of the reclamation parcel. <br /> Area # Area <br /> (acre) <br /> Al 1.65 <br /> A2 0.27 <br />