My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-21_PERMIT FILE - X201823602
DRMS
>
Day Forward
>
Permit File
>
Coal
>
X201823602
>
2019-08-21_PERMIT FILE - X201823602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 12:49:34 PM
Creation date
8/21/2019 12:45:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201823602
IBM Index Class Name
Permit File
Doc Date
8/21/2019
Doc Name
180 Day Report
From
Sarah Vance
To
DRMS
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
car° <br /> �/ to <br /> COLOR.ADO DIVISION OF DECLAMATION, MINING AND SAFETY <br /> 18.6 1313 Sherman Street, Room 215, Denver, Colorado 50203, (303) 866--3567 <br /> COAL EXPLORATION 180-DAY REPORT <br /> Prospector: CCC Energy, LLC Notice of Intent No.: X-20 18-236-02 <br /> Address: 6473 County Road 120 Pro'ect Name: Devil's Canyon Trust Exploration <br /> J <br /> Hesperus, CO 81326 Count � La Plata <br /> y• <br /> Date: August 20, 2019 <br /> This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado <br /> Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br /> Surface Coal Mining Act, C.R.S. 34-33-101 et seq. The purpose of this report is to update <br /> the Division on exploration and reclamation activities that have occurred in the past 180 days <br /> of active prospecting. The report also indicates any changes in operations from what was <br /> stated in the original Notice of Intent sent to the Division. The Operator may use this form, <br /> modify this form, or use a different format altogether. <br /> 1. Attach a map that shows: <br /> a) which proposed holes have been drilled at the date, <br /> b) Any actual or proposed relocations of holes, <br /> c) The extent of all significant road construction completed to date (exclude <br /> minor blade work), and <br /> d) Current location of all drill rigs and test equipment. <br /> 2. Describe what and where reclamation activities have occurred in the past 180 <br /> days. Mention sealing and plugging, regrading, retopsoiling and reseeding <br /> activities. (Attach additional pages, if needed.) <br /> Exploration holes GCC--18--03 , GCC-18-04 , GCC-18-05, GCC-18-06 <br /> GCC---18--08 were drilled and sealed. Exploration holes <br /> GCC-18-07 , GCC--18-09 & GCC-18-10 were not drilled and were <br /> dropped from the project . No roads were constructed.. Drill <br /> sites have not fret been completely reclaimed.. No drill <br /> drill holes were relocated. Drill rigs and test equipment <br /> have been demobilized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.