My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-19_PERMIT FILE - M2019046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019046
>
2019-08-19_PERMIT FILE - M2019046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:04:53 AM
Creation date
8/19/2019 1:47:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019046
IBM Index Class Name
PERMIT FILE
Doc Date
8/19/2019
Doc Name
Application
From
Southway Construction
To
DRMS
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Reclamation Timetable <br /> Reclamation will take place concurrently with mining with an additional estimated 6 months of <br /> reclamation commencing after mining is completed. Mining is projected to be completed by <br /> 2065. Therefore, final reclamation and bond release is expected to be completed by 2066 or <br /> within 46 years. Exhibit L: Reclamation Costs describes the worst case bond scenario. <br /> 3. Revegetation Plan <br /> For each area of reclamation, soil will be disked to loosen surficial soils. Due to the mild grade, <br /> seed can be drilled in most areas, but broadcast seeding will be utilized where reclaimed <br /> perimeter slopes do not allow drilling. The seed mix listed below will be used to revegetate the <br /> site with a native grass mix on all surfaces. Certified weed free mulch will be crimped into the <br /> surface at 2000 lbs. per acre. Fertilizer may be added as determined by a soil test at the time of <br /> seeding. Heavy furrows will be left in the tilled topsoil to provide moisture concentration and <br /> shade areas in order to promote better conditions for successful vegetation establishment. <br /> Seeding will take place during the fall following retopsoiling of slopes. Slopes will be regraded, <br /> backfilled, and retopsoiled as soon as they are able to be reclaimed and as additional mining <br /> phases become active. <br /> Bradford Mesa Quarry <br /> August 2019 E-5 <br />