My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-19_PERMIT FILE - M2019046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019046
>
2019-08-19_PERMIT FILE - M2019046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:04:53 AM
Creation date
8/19/2019 1:47:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019046
IBM Index Class Name
PERMIT FILE
Doc Date
8/19/2019
Doc Name
Application
From
Southway Construction
To
DRMS
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of material to be rehandled, will be minimized. Additionally, mined and unreclaimed acreage <br /> will be minimized and will make the worst case reclamation area smaller thus decreasing the <br /> required bond. <br /> In areas where large boulders are picked up, resultant depressions deeper than one foot will be <br /> filled with surrounding soils. All disturbed areas resulting from boulder retrieval, including <br /> tracks from cross-country equipment, will be seeded and harrowed to ensure rapid revegetation. <br /> The internal haul road will be left in place from the processing area and through Edmundson <br /> Ranch lands until it reaches County Road 120 as desired by the property owner. Map F-1 shows <br /> tentative post-reclamation roads to remain indefinitely; however, exact reclamation road <br /> orientations are not known and will be determined by the land owner. If a rail yard is developed, <br /> it will be left in place as desired by the landowner. <br /> The dump will be constructed in lifts 25 feet in height to create a final slope of 3H:IV. As lower <br /> lifts are completed,topsoil will be placed at 6 inch intervals and seeded with a native grass seed <br /> mix. Catch ditches will be constructed prior to each lift's seeding to control stormwater flows <br /> along the dump slope. Catch ditches will direct runoff to the dump slope sump east of the dump. <br /> Dump construction will occur such that<10 acres of dump space is disturbed and not in any <br /> phase of reclamation at any given time. <br /> On occasion, topsoil or overburden may be imported to the site to be used in reclamation. To <br /> ensure that all imported materials are clean and inert the individual or company delivering <br /> material to the facility is required to sign an affidavit certifying that material is clean and inert, <br /> states the original source, and the estimated volume. Additionally, certified inert concrete and <br /> asphalt may be imported to the site and used as the base layers of backfilling. This is <br /> advantageous because inert concrete and asphalt will be used to make up for the limited <br /> overburden expected to be recovered from the site. A blank affidavit of import can be found at <br /> the end of this exhibit. <br /> Bradford Mesa Quarry <.,.�,,,,,,,,�„„•,.,,,.,,,..� t, <br /> August 2019 E-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.