Laserfiche WebLink
August 8, 2019 C-1982-056/Foidel Creek Mine TNL <br /> t <br /> a <br /> L h A <br /> Ditch G2 needs to be re-established (photo below) belt rollers in ditch were removed by operator at time <br /> of inspection <br /> NOW- <br /> f s;, <br /> w, f <br /> u,r .n <br /> i <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Maintenance items: <br /> • Clear Sump to Pond B <br /> • Clear Delta at inlet of pond E <br /> • Clear ditch G-2 of mud tire tracks, garbage, and parts. And reestablish to allow flow. <br /> • Grade and reseed 3 topsoil piles at 9E <br /> • 5MN pad reseed <br /> • Vegetation is spare at the 9E Utility Borehole and will need to be (re)seeded. <br /> • 9E culverts need to be cleared <br /> • 9E needs additional disturbance boundary markers <br /> • Mine ID signs are needed at new borehole pads. <br /> • Topsoil pile that was moved to accommodate the waste pile expansion needs to be shaped and seeded. <br /> • Culvert F+A) appears to have been hit by a dozer and needs to be repaired again. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> Revisions currently under review: <br /> PR 12 Wolf Creek Reserve LBA Development and Mining: Decision Due Date Extended to 9/30/2019 <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 7of10 <br />