Laserfiche WebLink
August 8, 2019 C-1982-056/Foidel Creek Mine TNL <br /> • Wash plant area and culverts, Culvert 62 at wash plant needs to be cleared <br /> a. Train loadouts (SAE) <br /> i. Train loadout stream buffer zone <br /> ii. Ditch to Foidel <br /> iii. toe bulge between overland belt and tracks looks about the same as it has in recent months <br /> b. Truck loadout <br /> Upland diversion ditch around BOB pile <br /> • Topsoil pile south of BOB pile is currently being protected, more coal is in BOB pile than in recent months <br /> r. <br /> • Blasting storage area <br /> • Trudey's corner <br /> • Pond T <br /> a. Source is laydown area <br /> b. Discharge under railroad to Foidel <br /> c. Ditch going to Pond T <br /> • Coal Refuse Pile (4ft cover; 2.5 ft overburden and 1.5 ft topsoil) <br /> a. Culverts to pit and pond <br /> b. Seep at toe <br /> c. Seep at face of 1st lift <br /> d. Side ditches <br /> e. Diversion along the top <br /> • Original Waste pile <br /> a. Erosion was not noted at time of inspection <br /> b. No ponding of water was present on pile <br /> • 2 reference areas exist S of Pond A but were not checked during this inspection. <br /> North and East of Office <br /> • Facilities laydown area <br /> a. Ditches around area (half drain to Pond G & half to F) <br /> • Waste water ponds <br /> • Pond F (across from facilities): <br /> a. discharge to Foidel <br /> b. Source: facilities runoff <br /> • Pond G (At facilities entrance): <br /> a. discharge to Foidel Crk <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 4 of 10 <br />