Laserfiche WebLink
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Phase 1 DCF Erosion Repair <br /> NewFields Job No.475.0106.032 <br /> Tuesday,August 6,2019 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: PHASE 1 DCF EROSION REPAIR <br /> SITE: CRIPPLE CREEK&VICTOR GOLD MINE (COLORADO) <br /> CONTRACTOR: TEZAK HEAVY EQUIPMENT <br /> DATE: TUESDAY,AUGUST 6, 2019 <br /> TEMPERATURE: LOW: 52°F TO HIGH: 78°F <br /> WEATHER: PARTLY CLOUDY <br /> NEWFIELDS PERSONNEL ONSITE: <br /> Personnel Job Description Hours <br /> Eric Niebler Project Resident 0.5 <br /> Tyler Wendlandt Lead Soil Technician 2.0 <br /> 1.0 PHASE 1 DCF EROSION <br /> 1.1 Phase 1 Drain Cover Fill (DCF) Erosion Inspection <br /> NewFields (Tyler) and Foresight West (Gene) personnel met down on the Phase 1 erosion area <br /> to conduct an inspection of the surface of the DCF. Foresight West mapped the overall surface <br /> of the area and then shot points on the deepest erosion rills as identified by NewFields for <br /> informational purposes. It was also noted by NewFields that no geomembrane was exposed by <br /> the erosion of the DCF. <br /> 2.0 MEETINGS AND COMMUNICATIONS <br /> NewFields coordinated with Jeff (Newmont) and determined an inspection and survey of the <br /> DCF surface should be performed. <br /> Page 1 <br />