My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-14_INSPECTION - M1980244
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980244
>
2019-08-14_INSPECTION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:46:39 AM
Creation date
8/15/2019 11:15:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Date
8/14/2019
Doc Name
Quality Assurance Report/Corrective Action
From
CC&V
To
DRMS
Inspection Date
7/23/2019
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Phase 1 DCF Erosion Repair <br /> NewFields Job No.475.0106.032 <br /> Tuesday,August 6,2019 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: PHASE 1 DCF EROSION REPAIR <br /> SITE: CRIPPLE CREEK&VICTOR GOLD MINE (COLORADO) <br /> CONTRACTOR: TEZAK HEAVY EQUIPMENT <br /> DATE: TUESDAY,AUGUST 6, 2019 <br /> TEMPERATURE: LOW: 52°F TO HIGH: 78°F <br /> WEATHER: PARTLY CLOUDY <br /> NEWFIELDS PERSONNEL ONSITE: <br /> Personnel Job Description Hours <br /> Eric Niebler Project Resident 0.5 <br /> Tyler Wendlandt Lead Soil Technician 2.0 <br /> 1.0 PHASE 1 DCF EROSION <br /> 1.1 Phase 1 Drain Cover Fill (DCF) Erosion Inspection <br /> NewFields (Tyler) and Foresight West (Gene) personnel met down on the Phase 1 erosion area <br /> to conduct an inspection of the surface of the DCF. Foresight West mapped the overall surface <br /> of the area and then shot points on the deepest erosion rills as identified by NewFields for <br /> informational purposes. It was also noted by NewFields that no geomembrane was exposed by <br /> the erosion of the DCF. <br /> 2.0 MEETINGS AND COMMUNICATIONS <br /> NewFields coordinated with Jeff (Newmont) and determined an inspection and survey of the <br /> DCF surface should be performed. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.