Laserfiche WebLink
of cTR01 <br /> c <br /> t COLORADO DIVISI( rION, MINING AND SAFETY <br /> 1313 Sherman Street,P ACY\thm 80203 ph(303)866-3567 <br /> RECERM <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> File No.: M- <br /> 1990-140 Site Name: <br /> Martin Pit 1 A AUG 13 2019 <br /> Moffat OFRECLAM1ION <br /> County TR# (DRMS SAFE' <br /> Permittee: Duran & Pearce Contractors ; <br /> 4� <br /> Operator(If Other than Perm ittee): �^ o <br /> Permittee Representative. Derek Duran <br /> Please provide a brief description of the proposed revision: <br /> Duran&Pearce Contractors would like to add crushing operations to the mining plan. Our current mining plan did not include crushing <br /> operations. Currently there is large stockpiles of used concrete and used asphalt that D&P would like to crush and process for re-use <br /> on-site. At this time it is believed that NO new disturbances will occur from this operation. Crushing operations would only take place during <br /> summer and fall seasons and is believed to only take 30-60 days to complete. <br /> As defined by the Minerals Rules,a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> N <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes 3 c <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />