Laserfiche WebLink
KCV0 ILGOR-E �aj PEAK <br /> Plpe MATERIALS <br /> August 9th, 2019 <br /> Colorado Division of Reclamation, Mining and Safety <br /> RECEIVED <br /> Attention: Amy Yeldell ^,� <br /> 1313 Sherman Street, Room 215 AUG ` <br /> Denver, CO 80203 DIVISIG` <br /> MININIG Ai%Li 4".k ii f <br /> RE: Orchard Grove Pit—M-1990-094 <br /> Technical Revision TR2—Mining& Reclamation—Response to Questions dated 7/31/2019 <br /> Dear Amy Yeldell - <br /> The final use of the property is to be industrial development which will include 16 acres of parking. Gravel and <br /> backfill material will be stockpiled on this location. The pit has 12,000 CY of backfill on the site and we will <br /> continue to accept import material for structural backfill as well as top soil that will total no more than 30,000 <br /> CY. This import material will be used to backfill the 6 acre pond. There will be no ponds at final reclamation. <br /> Currently we have 1500 CY of topsoil. Depth of topsoil will be no less than 3 inches deep. Any additional <br /> topsoil needed will be imported from Mesa County Compost Facility. Cottonwood trees will be planted <br /> parallel to the Redlands Parkway at a spacing of approximately 40 feet. <br /> We requested on April 2°1 2019 that DRMS calculate the surety bond and we would agree to that amount. <br /> Please accept the attached document. <br /> Please feel free to contact me with any questions, concerns at(970-712-6634)or <br /> jim.doody@elamconstruction.com. Thank you for your time and consideration of this request. <br /> Kindest Regards, <br /> y. <br /> V <br /> Jim Doody <br /> Environmental Compliance Manager <br /> Kilgore Companies- Colorado Companies <br /> 556 Struthers Avenue—Grand Junction, CO 81501 <br />