Laserfiche WebLink
y <br /> MATERIAL Base material <br /> AMOUNT AVAILABLE 600 loads <br /> SAFTEY ISSUES NOTED IN PIT <br /> 1 Pit boundaries not clearly marked AIII Markers in Place <br /> 2 need Vehicle tracking pads at pit exits Done <br /> 4 Cattle guards need cleaned out DONE <br /> 6 no discernible floor to pit BEING ADDRESSED DONE <br /> High wall issues from landowner <br /> Leaking hydraulic oils and diesel from land owners equipment in permited area <br /> Corrective action needed. <br /> 1 stockpile material needs to be hauled out and floor of pit needs to be cut and established for depth <br /> and drainage IN PROCESS <br /> 2 pit boundaries need to be firmed up DONE <br /> 3 cattle guards need cleaned and elevated to prevent runoff from entering <br /> December 29, 2016 <br /> Floor has been partially re cut <br /> Cut faces have been re established <br /> Vehicle tracking pad in place on pit exit road to help with material being drug onto highway. <br /> Drainage has been established to the east. <br />