Laserfiche WebLink
Mining Plan Exhibit C <br /> The estimated date that the mining will commence will be September 2nd, 2019 and will <br /> be complete on December 315t, 2019. The estimated depth of soil that will be salvaged for use <br /> in the reclamation process will be 6-12". We anticipate that there will be no overburden to <br /> reach the gravel. We anticipate that we will be mining an average of 15' of gravel. The only <br /> major component for the pit will be access road leading into the pit. There will be no offices, <br /> buildings, or facilities at the location of the pit. We will have an initial stockpile of top soil that <br /> will be roughly 100' by 40' by 20' and will reclaim as we mine the rest of the pit. The only road <br /> improvements necessary will be to the access road between the county road and the gravel pit. <br /> For the access road we will remove 6-12" top soil and replace and compact with gravel. We will <br /> be using minimal water for dust control during the operation of the gravel pit. Our water source <br /> will be from the city of Flagler CO. The primary and only commodity that we will be mining will <br /> be gravel which will be used on the turbine site string roads. There will be no explosives used in <br /> conjunction with the mining operation. <br /> Reclamation Plan Exhibit D <br /> We plan to reclaim the top soil for the gravel pit as we work from one end of the pit to <br /> the other. Reclamation is expected to be complete by December 31, 2019. We will start <br /> replacing topsoil once we have 2-4 acres of the gravel pit mined.The maximum slopes of the <br /> reclaimed slopes will be 4:1. In order to revegetate the gravel pit we will de-compact the site <br /> and drill seed with the landowner's recommended natural blend. Our estimated reclamation <br /> cost is $45,000 for contouring and top soiling. Seeding will be an additional $5,000. <br />