Laserfiche WebLink
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> FReclamabon West Farm Pil <br /> 8/5/2019 <br /> Bond Quantities and Costs <br /> Co=nddxa be. <br /> Summary of Roclamatlon Bond Cosh <br /> ec amation Operation Quantity Unit Unit Cost Cos <br /> Amendment 01 Bond Costs <br /> DRMS Calculated Bond 1 Is $1,849,793 $1,849,793 <br /> Items Added in Technical Revision 5 <br /> Removal of Disposal of Conveyor Support Wood Ties 350.00 ea $10 $3,500 <br /> Demolition&Removal of Concrete Washer Screen Pads 17.00 cy $500 $8,500 <br /> Demolition&Removal of Concrete Head Unit Pad 1400 cy $500 $7,000 <br /> Demolition&Removal of Concrete Radial Stacker Pads 6.00 cy $500 $3,000 <br /> Removal of Pit Run Material from CH HH.5 9,125.00 cy $2 $18,250 <br /> Removal of CMP Culvert 1.00 Is $15,000 $15,000 <br /> Total Direct Cost $55,250 <br /> Overhead and Profit Cost(13 07%) $7,221 <br /> Contract Cost $62,471 <br /> Project Management(7.00%) $3,868 <br /> Additional Warranty Required For Technical Revision 5 Items $66 339 <br /> Total Financial Warranty Required For All Phases $1,916,132 <br /> 1 of 1 <br />