Laserfiche WebLink
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 7/14/19 and completion: 10/15/21 <br /> 2) How many years ' Ithe mine anticipated to be operational,: 3 years <br /> 3) Will mining activ es occur all-yearlong or just seasonally when weather permits(check one): <br /> (�all-yearlong ar CED seasonally,explain: 2-3 week period in July/August weather permittini <br /> 4) How many aces of the mine site will be disturbed at any given time: .06 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches =10-12 inches <br /> Other: 0-3in site 1, 3-6in.site 2 <br /> _F-1 N/A,explain: <br /> 6) Will you need to move any overburden (check one): (]D)Yes or(_E)No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: (0)existing roads dD) new roads will be created <br /> Please describe the existing roads: <br /> AGcess is fro�p established non systorn ro2dr.-Old forest sandca ro2d 215 and 215'A'_These roads <br /> Ferain ba Oedunder u 5 F.5- Plan- v--' OPMT/'D&: <br /> a. If there wi 1' be new roads or road improvements, please describe the new roads and road <br /> improveme its: <br /> Nnew maids needed_ <br /> 8) Will water be needed during the mining operation (check one): (E3-)Yes or LQ)No <br /> a' If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (Q)Yes or(L6)No <br /> a. If yes,plea+,se describe the water diversions or impoundments: <br /> 10)Will any chemicals Ibe used during the mining process(check one): (J:L)Yes or(JZD No <br /> a. If yes,please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should inc de tank capacities and operating solution volumes: <br />