My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-06_REVISION - C1981019 (14)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2019-08-06_REVISION - C1981019 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:32:20 AM
Creation date
8/8/2019 6:54:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/6/2019
Doc Name Note
Emailed Findings
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
OSM
Type & Sequence
SL15
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo has applied for fourteen previous bond releases: <br /> Previous Bond Release Summary <br /> Bond Release Phase Submittal A roval Date <br /> Date pp <br /> SL-01 I and II 7/2/1987 10/8/1987 <br /> SL-02 I 9/25/1997 4/27/1998 <br /> SL-03 II 9/26/2000 8/15/2001 <br /> SL-04 I and II 6/1/2010 7/25/2001 <br /> SL-05 III 6/28/2010 7/25/2012 <br /> SL-06 I 4/26/2012 4/9/2013 <br /> SL-07 I 4/2/2013 8/29/2013 <br /> SL-08 I 5/20/2015 1/7/2016 <br /> SL-09 I 2/29/2016 9/28/2016 <br /> SL-10 III 7/18/2016 1/12/2017 <br /> SL-11 I 3/10/2017 11/13/2017 <br /> SL-12 II and III 3/10/2017 12/7/2017 <br /> SL-13 I 4/12/2018 8/3 0/18 <br /> SL-14 II and III 5/24/18 11/24/18 <br /> See Map 1 in the SL-15 application for the locations of the previous Phase I Bond Releases at the <br /> Colowyo Mine. See Table 1 in this document for the previous bond release acreages and Table 2 in <br /> this document for the previous bond release amounts. <br /> SL-15 Partial Phase I,II and III Bond Release Application <br /> The SL-15 application was received by the Division on February 8, 2019 and deemed complete on <br /> March 21, 2019. Colowyo published notice of the bond release application in the Craig Daily Press <br /> once weekly for four consecutive weeks,beginning February 12, 2019 and ending on March 6, <br /> 2019. Colowyo notified land owners within and ad j acent to the mine permit area, the Office of <br /> Surface Mining(OSM),the BLM, Colorado State Land Board(CSLB) and other interested parties <br /> of the application for bond release, as required by Rule 3.03.2(1). No comments,written objections <br /> or requests for an informal conference regarding the bond release application were received by the <br /> Division. <br /> A bond release inspection was scheduled and conducted on June 12, 2019. The site inspection was <br /> conducted in accordance with Rule 3.03.2(2). Inspection attendees included: Zach Trujillo,Jason <br /> Musick, and Leigh Simmons of the Division; Tom Medlin of OSM; and Tom Fry of Colowyo. No <br /> representatives from the BLM, State or local agencies, or adjacent land owners attended the <br /> inspection. A summary of the bond release inspection are presented in Section IV,below. Detailed <br /> observations of the inspection are documented in the inspection report that was issued June 17, <br /> Proposed Decision and Findings of Compliance August 6,2019 <br /> Partial Phase I,II and III Bond Release SL-15 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.