Laserfiche WebLink
oF.co� <br /> * COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> �876 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- M-2007-087 Site Name: Priola Pit <br /> County Adams TR# (DRMS Use only) <br /> W � � <br /> Permittee:Albert Frei and Sons, Inc. low" n N <br /> -a <br /> Operator(If Other than Permittee): R03 <br /> T AUG 05 ifflo <br /> co <br /> Permittee Representative: Bernard Frei JLElmac or rgah 5. <br /> •es �.sn�— can <br /> Please provide a brief description of the proposed revision: <br /> The TR is to make minor changes to the final reclaimed configuration to match the as <br /> built conditions at the mine now. Additional information and maps are attached as part <br /> of this request. o <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application rn <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or ° O <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted 0 C� <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Re uired TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries (::$::216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 <br />