My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-01_REVISION - M2018051 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018051
>
2019-08-01_REVISION - M2018051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 2:53:53 AM
Creation date
8/1/2019 1:03:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018051
IBM Index Class Name
Revision
Doc Date
8/1/2019
Doc Name
Addendum To Application
From
Black Mountain Sand
To
DRMS
Type & Sequence
AM1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
210 <br /> !:"10,.'It <br /> activities. Protocol states that a minimum of 10 minutes of survey time at a single location should be <br /> conducted between a half an hour before sunrise to 2 hours after, and/or 2 hours before sunset to a half <br /> an hour after.The habitat size and number of observation points needed will dictate how long each survey <br /> will last. 2DOT recommends conducting these surveys in the beginning of August to capture BUOW <br /> presence/absence for the amendment. <br /> Please let me know if you have any questions. <br /> Thank you, <br /> Spencer Morrison <br /> i Spencer Morrison <br /> j project manager•wildlife biologist <br /> mornson @2d,,t-consultmg.com <br /> 2200 West 2V Ave.,Ste.102 Denver,CO—303 953.1255 <br /> 20 <br /> 116 Bridge Ave.,Saratoga,WY—307 326 3237 <br /> f mobile:303 726.3181 <br /> drones.environmental.civil engineering.water soil air•remediation <br />
The URL can be used to link to this page
Your browser does not support the video tag.