Laserfiche WebLink
Exhibit D-1 <br /> Mining Plan <br /> CONFIDENTIAL <br /> All activities,schedules, pit operations, materials mined, impacts, mining methods and other <br /> information referenced in the previous mining plan will continue with this additional area added to the <br /> operation. This has been included as Exhibit D-2 for reference. The only change to the mining operation <br /> will be the additional 5.8 acres of permitted area,which is Phase/Pit 4. <br /> Topsoil will be stripped and added to existing stockpiles, and a visual berm will be created with dozers <br /> and excavators on the north boundary of the site. The existing fence on the west boundary of the site <br /> will be removed and relocated to the north boundary of the site, connecting to existing to restrict public <br /> access. <br /> Pit 4 will be mined upon permit completion in 2020. The total mined area is 2.7 acres which will yield <br /> approximately 250,000 tons with the additional 30'gained from the setback of Pit 1. The expected life <br /> of this operation is 1-3 years depending on market conditions. This will extend the life of the operation <br /> 2 years to 2034. <br /> Exhibit D-3 shows the mining plan for the additional operation,and D-4 the previous mining plan map. <br /> 11Page <br />