Laserfiche WebLink
Table D-1 Reclamation Task and Cost Estimate <br /> Reclamation Table <br /> Time <br /> Activity Description Months Cost <br /> Remove All Mining Equipment and Stockpiles 2 $5,000 <br /> Knockdown the mining face at vertical edges to 3:1 Slope 0.1 $1,200 <br /> Final Grading of 3:1 Slopes 500 1 $5,000 <br /> Grading of pit floor and side slopes .5 $2,500 <br /> Rip Pit Floor and Compacted Areas 0.1 $2,500 <br /> Totals 3.7 $16,200 <br /> DRMS Costs (25%x Direct Costs) $4,050 <br /> Total Bond Amount $20,250 <br />